The biggest challenge was to design and build 2 primary data
centres and 2 recovery data centres in a very short period.
We also faced a challenge when it came to coordinating
between multiple vendors, and the delivery, testing, and
migration of new IT equipment and systems into a fully
operational data centre build.
To enable this nationwide venture, we built a strong IT
infrastructure and service backbone which enabled the
capture, processing, and exchange of information amongst all
the stakeholders. The expertly crafted data centre design
was space-efficient, saved energy, had more cabinet
positions, delivered more power and cooling capacity, and
was more resilient. The project was also delivered ahead of
the deadline with careful attention to the client.
Through close liaison with the client and other third-party
contractors, and with close coordination of critical path
items and optimized activities, we completed the project
successfully before the deadline.